So here is where we were at with construction of our straw bale house at the end of July, 2010. As you can see the garage has been up for some time now. All of our household stuff is being stored in there and it fits! That means that we have downsized all of our crap that we feel we no longer require in our lives. Stuff that bogs us down and certainly has no place in our new house which will be half the size of our old place. I still cannot get over what a good feeling it is to simplify things even just a little.

As you can see the slab is prepped and the plumbing is in place for our hot water heating system and potable water. As I type this on August 3 the concrete has been poured and materials are on-site for the wall construction to commmence this week. I will post some pics of that process. This is where it finally gets a little interesting and begins to look like something a little out of the ordinary. 

At the start of the bale assembly construction, the measurements are taken on the slab and the wood bale bearing assemblies (BBA) are constructed. Next, the window and door bucks are built. Towards the end of the week, the bales will be delivered and the final plans will be made to build the walls by placing bales. This all has to be timed for good weather, the arrival of the trusses and the crew to roof the house. Once the bale walls are in place, they cannot get wet! 


No comments:

Post a Comment